Preferential Supply Air Handling Unit Ahu for Station / Hall

Product Details
Customization: Available
After-sales Service: Online
Warranty: 1 Years
Still deciding? Get samples of US$ 350/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Years of Export Experience
The export experience of the supplier is more than 10 years
Fast Delivery
The supplier can deliver the goods within 15 days
100% Finished Products Inspection
The supplier inspects 100% of finished products.
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO45001:2018 certificate
ISO14001
to see all verified strength labels (25)
  • Preferential Supply Air Handling Unit Ahu for Station / Hall
  • Preferential Supply Air Handling Unit Ahu for Station / Hall
  • Preferential Supply Air Handling Unit Ahu for Station / Hall
  • Preferential Supply Air Handling Unit Ahu for Station / Hall
  • Preferential Supply Air Handling Unit Ahu for Station / Hall
  • Preferential Supply Air Handling Unit Ahu for Station / Hall
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Certifications
  • Packaging & Shipping
  • Installation Instructions
  • Company Profile
  • Our Advantages
  • FAQ
Overview

Basic Info.

Model NO.
ZKL(X)-08
Type
Air Handling Unit
Air Tube Material
Galvanized Sheet
Corrosion Durability
Ultrahigh
Operating Voltage
110V~380V
Noise Level
Ultra Low
Application Fields
Industrial, Office, Hospital, Exbition Hall
Mounting
Floor Standing
Lifetime
>20 years
Certification
ISO, CE
Condition
New
Key Selling Points
Competitive Price
Weight (Kg)
200
Machinery Test Report
Provided
Video Outgoing-Inspection
Provided
Core Components
Motor
Function
Cooling Ventilation Humidification Air Purifier
Keyword
Air Handing Unit
Airflow
8000m³/H
Noise
55dB
Cooling Capacity
65.4~116.3kw
Heating Capacity
85.6~152.3kw
Transport Package
Wooden Case
Specification
850x1430x1750mm
Trademark
XUGUANG
Origin
China
HS Code
8415830000
Production Capacity
30000PCS/Month

Packaging & Delivery

Package Size
85.00cm * 143.00cm * 175.00cm
Package Gross Weight
200.000kg

Product Description

                                       Vertical Type Air Handling Unit
Product Description

 

Preferential Supply Air Handling Unit Ahu for Station / Hall
Preferential Supply Air Handling Unit Ahu for Station / Hall
Preferential Supply Air Handling Unit Ahu for Station / Hall
Preferential Supply Air Handling Unit Ahu for Station / Hall
Preferential Supply Air Handling Unit Ahu for Station / Hall
Preferential Supply Air Handling Unit Ahu for Station / Hall
 
Product Parameters

 

Modle/Parameters Air volume m3/h Full external pressure/Pa Motor Power/kw Number of heat exchanger rows Cooling capacity/kw Heating capacity/kw cooling water flow m3/h Heating water flow/m3/h Noise dB(A)
ZKW(X)/ZKL(X)-03 3000 80 0.55 4 24.5 32.5 4.21 2.8 55
150 0.75 6 33.6 44.1 5.78 3.8 61
300 0.75 8 43.6 57.9 7.5 4.98 68
ZKW(X)/ZKL(X)-04 4000 80 0.75 4 32.4 42.8 5.57 3.68 57
150 0.75 6 43.7 58.7 7.51 5.05 64
300 1.1 8 57.6 76.3 9.9 6.6 72
ZKW(X)/ZKL(X)-05 5000 100 0.8 4 40.8 53.6 7.02 4.61 59
200 1.1 6 55.7 73.4 9.58 6.31 66
350 1.8 8 72.7 95.4 12.5 8.2 74
ZKW(X)/ZKL(X)-06 6000 150 1.1 4 49 63.5 8.43 5.46 62
300 1.5 6 66.9 87.9 11.5 7.56 68
400 1.8 8 87.2 113.3 15 9.74 75
ZKW(X)/ZKL(X)-07 7000 150 1.5 4 57.2 74.5 9.84 6.41 63
300 2.2 6 87.4 117.3 13.5 10.1 70
400 3 8 102 152.3 17.5 13.1 76
ZKW(X)/ZKL(X)-08 8000 150 2*08 4 65.4 85.6 11.2 7.4 64
300 2*1.5 6 90.9 117.3 15.6 10.1 66
400 3 8 116.3 152.3 20.0 13.1 73
ZKW(X)/ZKL(X)-09 9000 150 2*1.1 4 77.1 95.4 13.3 8.2 65
350 2*1.5 6 103.8 131.4 17.8 11.3 67
450 4 8 137.1 169.8 23.6 14.6 75
ZKW(X)/ZKL(X)-10 10000 150 2*1.1 4 88.2 107.2 15.2 9.2 65
350 2*1.8 6 112.2 146.7 19.3 12.7 71
450 4 8 156.9 190.7 27.0 16.4 78
ZKW(X)/ZKL(X)-15 15000 150 2*1.5 4 134.2 160.7 23.1 13.8 71
350 2*2.2 6 170.9 220.1 29.4 18.9 73
450 7.5 8 238.7 286.0 41.0 24.6 77
ZKW(X)/ZKL(X)-20 20000 200 2*3 4 180.4 211.7 31.0 18.2 71
400 2*4 6 244.2 293.1 42.0 25.2 76
450 11 8 320.9 376.7 55.2 32.4 78
ZKW(X)/ZKL(X)-25 25000 250 2*3 4 226.8 264.7 39.0 22.8 78
450 2*4 6 304.7 366.3 52.4 31.5 80
550 15 8 403.5 470.9 69.4 40.5 83
ZKW(X)/ZKL(X)-30 30000 250 2*4 4 262.9 218.3 45.2 27.4 79
450 2*5.5 6 366.3 438.3 63.0 37.7 81
550 18.5 8 476.7 566.3 82.0 48.7 83
ZKW(X)/ZKL(X)-40 40000 300 2*5.5 4 357.1 423.5 61.4 36.4 78
400 2*7.5 6 487.3 584 83.8 50.2 80
600 18.5 8 635.4 753.5 109.3 64.8 84
Preferential Supply Air Handling Unit Ahu for Station / Hall
Preferential Supply Air Handling Unit Ahu for Station / Hall
Preferential Supply Air Handling Unit Ahu for Station / Hall
Preferential Supply Air Handling Unit Ahu for Station / Hall
Certifications

 

Preferential Supply Air Handling Unit Ahu for Station / Hall
Preferential Supply Air Handling Unit Ahu for Station / Hall
Packaging & Shipping
Preferential Supply Air Handling Unit Ahu for Station / Hall
Preferential Supply Air Handling Unit Ahu for Station / Hall
 
Preferential Supply Air Handling Unit Ahu for Station / Hall
Preferential Supply Air Handling Unit Ahu for Station / Hall
 

Preferential Supply Air Handling Unit Ahu for Station / Hall
 

Installation Instructions
1. The Ceiling air handling unit should be installed inside the ceiling
Compartment, the side of the condensate pipe is allowed to be as
As five thousands, and the flip is not allowed to be high to ensure the
Smooth discharge of condensate. There should be sufficient space for                               
Installation and maintenance around the unit.
2.The condensate discharge connected to the unit must be sealed
With a sufficient height.
3.The condensing water connection pipe of the table is lower in and up,
and the globe vale and filter should be installed at
The inlet
4.The air duct connected to the unit should be flexibly connected ,
and the water pipe connected to the unit should adopt a flexible nozzle, and
The torque during the takeover should not to be too large, so as not to damage the heat exchanger , the
pipeline must have a separate bracket and the weight shall not be borne by the unit.
5.The power supply of the unit is 380V,50HZ. The power supply meets the requirements to connect
with the motor, after,The power supply is connected, it should be checked whether the fan steering is
correct, if reversed, it should be stopped to change the power supply phase sequence.
Notice:1,H=P/10+20(mm)
2,P is the maximum negative pressure of the unit(mmH2O)

Operation and Maintenance of the Units
1.The unit cooler and heat medium should be clean demineralized water, and its working pressure
should not exceed 1.5Mpa
2.During the normal operation of the unit, the temperature rise of the fan bearing does not exceed
40 degrees 3.The outlet pipe of the unit is equipped with an exhaust valve,before the first operation
and the conversion between hot and cold, the air valve should be opened to drain the air in the heat
exchanger and the pipeline so as not to affect the heat exchanger effect. The unit provides cold
water temperature of not less than 5 degrees is summer and no more than 80 degrees celsius in
winter.
4.In the cold areas of winter and the new fan unit, when the heating mechanism is opened, the
heater should
be opened for 5-10 minutes before the fan supply should be started, prevents large amounts of
cold air from forming an ice plug in the heat exchanger, when the machine is stopped, the fresh
air valve should be closed first, the heater should be closed, and finally the blower should be
closed.
5.When the unit is not used in winter, the water in the coil should be drained and dried a with
a compressor, if the stored water cannot be blown clean, antifreeze should be added to
the tube, if the unit is temporarily running in winter for a short time, it should ensure that
there is hot water circulation in the pipe to prevent rust and freeze , in addition to winter,
when the heat exchanger is deactivated in other seasons, the heat exchanger should also be
filled with water to reduce rust. 6.The filter should be cleaned regularly to ensure the use of
the unit effect, such as the air volume is found to be reduced, generally caused by too much filter
dust.
7.After one month of operation of the unit, it is necessary to check whether the hoisting fasteners
and fan tightening bolts are loose.After two to three years of operation, the unit should be fully
maintained to clear the scale in the heat exchanger tube. Wash the heat exchanger fins with
compressed air or water, Lubricating parts such as fans and motors should be filled with lubricating
oil regularly.
Company Profile

Shandong XUGUANG Tank Air Conditioning Equipment Co., Ltd. was established in 2008, It is the supplier of the overall product at the end of the central air conditioning system, set composite materials, fresh air equipment, fire smoke exhaust equipment and other products research and development, design, production, sales as one of the modern enterprises. Our products have been installed in many countries such as the Russian Federation, Southeast Asia, America,  and so on. The business scope includes a central air conditioning system, FCU, AHU, Fresh air ventilation, Water tanks etc.
The Company has the Fire Protection Product Certification of the Ministry of Emergency Management, CRAA China refrigeration and air conditioning industry authority product performance certification, The water tank molded products won the health license certification of the Shandong Provincial Health Department.  It has passed IS09001 International Quality Management System Certification, IS014001 International Environmental Management System Certification and OHSAS18001 Occupational health and Safety Management System Certification  
Preferential Supply Air Handling Unit Ahu for Station / Hall

Our Advantages

Preferential Supply Air Handling Unit Ahu for Station / HallPreferential Supply Air Handling Unit Ahu for Station / Hall

FAQ

 

1 Are you a trading company or a manufacturer?
A: We are a manufacturer as you can see in our workshop as above.
2. What information of AHU do you need to provide to get a quotation? 
 Generally, for Air Handling Unit we need to know the following information:
 1) Cooling capacity;
2) Air volume, fresh air volume? 
3) Static pressure & Air filter etc; 
4) Chilled water type
or DX type with outdoor unit?
 5) Application of the air handling unit?
 6) Other special requirements?
3.  What is the warranty of products? 
 For 1 year warranty. Free to amend and change the parts due to quality reasons in warranty year.

  1.  What is your payment term?
    A:Normally T/T 30% in advance, balance to be paid before delivery.


 





 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now